Description
The Engineering Scheduler performs advanced aspects of planning/scheduling, project controls and administrative scheduling functions with minimal supervision. The Engineering Scheduler is responsible for developing and maintaining the Level 3/4 Engineering Schedule on all projects. The Level 2/3 and above schedule will be maintained by the Project Scheduler with which the Engineering Scheduler must work hand in hand.
The Engineering Scheduler is responsible for resource loading the schedule at the appropriate level and working with the Department Managers to ensure that resources are available to maintain the scheduled activities.